· 

w/e 04/06/2023

On a 7 1/4" gauge coach there was a test for compressed air leaks and fixing broken connector, and then a function check of brakes.

Also another 7 1/4" gauge coach was being cleaned and painted.

Outisde painting of The Sidings.

The round garden weeded and dug over.

Work done on extending the 7 1/4" gauge outer track.


Two club members had a table at the Sleaford Model Railway Clubs show.  They had on display their engine 'JILL', they also displayed some railway books which for a donation a person could chose a book to keep.  £80 was donated/raised, Well done BB and JB.