This week work was done on the catering van (Food Station), and drainage work was undertaken. Signal planning took place.
![](https://image.jimcdn.com/app/cms/image/transf/dimension=230x1024:format=jpg/path/s76c25355d83972ff/image/i6f98e72a991e5df1/version/1709490781/image.jpg)
Photo shows work being done to some metal supports for the planned addition of a 3.5 inch gauge track to the 5 inch gauge raised track.
Two lady members cleaning the outside tables and chairs.
![](https://image.jimcdn.com/app/cms/image/transf/dimension=232x1024:format=jpg/path/s76c25355d83972ff/image/i5ecbc80b43d15721/version/1709490781/image.jpg)
Twigs and branches being disposed of.
![](https://image.jimcdn.com/app/cms/image/transf/dimension=229x1024:format=jpg/path/s76c25355d83972ff/image/if2fadb4996008bc4/version/1709490781/image.jpg)
The water tower for the 5 inch gauge had its plumbing finished and the casing got painted, just needs a roof to it now.